Construction cost of Euro-Asian oil corridor
Kort samengevat
The cost of the Brody (Ukraine)-Adamova Zastava (Poland) oil pipeline project has been reduced by approximately 130 million euros as a result of a feasibility study update.
Verder lezen bij de bron
Bekijk het volledige nieuwsbericht rechtstreeks bij Trend.Az.
Lees het volledige bericht ↗